Maximum Operating Voltage | 150KV |
Focal Spot Size | 0.6/1.2 |
Diameter | 73mm |
Target Materia | RTM |
Anode Angle | 12° |
Rotation Speed | 2800/8400RPM |
Heat Storage | 300kHU |
Maximum Continuous Dissipation | 750W |
Large Focus | 5.4A |
Small Focus | 5.4A |
Inherent Filtration | 1mmAl/75KV(IEC60522/1999) |
Maximum Power(0.1S) | (50/60Hz) 20KW/50KW
(150/180Hz) 30KW/74KW |
Anode drive:150Hz/180Hz
X-ray tube will emit X-ray when it is energized with high voltage, Special knowledge should be required and cautions need to be taken when handing it.
1.Only a qualified specialist with X-Ray tube knowledge should assemble,maintain and remove the tube.
When mounting tube inserts adopt proper caution, in order to avoid glass bulb breaking and fragments projection. Please use protective gloves and glasses.
2.Tube insert connected to H.V.supply is radiation source:be sure to take all necessary safety cautions.
3.Wash thoroughly with alcohol the external surface of tube insert(care of fire risk).Avoid contact of dirty surfaces with cleaned tube insert.
4.Clamp system inside housing or self-contained units must not mechanically stress the tube.
5.After installation, check the right working of the tube(no fluctuation of tube current nor crackling).
6.Comply with insert thermal parameters, planning and programming the exposure parameters and cooling pauses. Housing or self-contained units must be provided with an adequate thermic protection.
7.Voltages indicated in charts are valid for transformer supplied with ground center.
8.It is extremely important to observe the connection diagram and the grid resistor value. Any change could modify the dimensions of the focal spot, also varying diagnostic performances or overloading anode target.
9.Tube inserts contain environment polluting materials, particularly lead liner tubes, Please apply to qualified operator for waste disposal, according to local regulation requirements.
10.When any abnormalities are found during operation, immediately switch off the power supply and contact the service engineer.
◆This high vacuum product is produced according to state-of-the-art technology. To prevent implosion please handle with care and use protective devices, e.g.glasses!
◆In the interest of complying with legal requirements concerning the environmental compatibility of our products(protection of natural resources, avoidance of waste)we endeavor to reuse components and to return them to the production cycle. We guarantee the functioning, quality and life of these components by taking extensive quality assurance measures, just as for factory-new components.
Minimum Order Quantity: 1pc
Price: Negotiation
Packaging Details: 100pcs per carton or customized according to the quantity
Delivery Time: 1~2 weeks according to the quantity
Payment Terms: 100% T/T in advance or WESTERN UNION
Supply Ability: 1000pcs/ month